Skip to content
SafetyCulture
Template

Risk Assessment and Method Statement

Downloads: 0
Get this template

Use this Risk Assessment and Method Statement template to plan safe work on industrial and construction sites. Capture site details, equipment IDs, permits to work, and emergency procedures. Identify hazards including working at height, rigging, manual handling, chemicals, energy isolation, vehicles, and poor conditions. Assess risk, define controls, and document PPE. Record working at height risk levels, rescue plans, inspections, and equipment checks. Cover environmental and traffic controls, lone working, and communication. Verify hazardous energies and re-energization steps. Finalize with acknowledgements and signatures for engineers and team members.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .