Use this quality assurance checklist to verify Humes pipe system components during fabrication, fitout, and dispatch. Confirm steel tightening on shaft, base, surround, and lid; validate concrete against specifications with attached supplier test reports; and check stainless steel measurements. Capture exact dimensions for base, shaft, surround, and lid. During fitout, address honeycombs, grind edges, seal penetrations, and apply branding and markings for inlet/outlet alignment. Verify inlet/outlet core diameters, DN of stubs, and depths to invert. Before transport, complete load checks, confirm delivery details, and record driver contact info to ensure dispatch integrity.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
