Semi-Annual Recirculating Pump Maintenance Checklist
by Botha CG, from the Community
This semi-annual preventive maintenance checklist guides technicians through servicing a close-coupled recirculating pump. It outlines required tools and materials, key safety steps such as lockout/tagout, and detailed procedures: cleaning the pump casing and motor vents, inspecting wiring and controls for overheating or damage, tightening base bolts, draining the housing, checking suction and discharge performance, cleaning strainers, cycling isolation valves, and removing tags before startup. It includes operational testing for vibration, check valve action, shaft seal leakage, flange and fitting leaks, and recording inlet and outlet pressures before returning the unit to service. Use it to standardize maintenance and log results.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
