Use this Pre-Delivery Inspection (PDI) Report checklist to assess ISO tanks and cryogenic vessels before dispatch. Review outer vessel and frame condition, paintwork, welding, fork pockets, earthing points, and pipework. Verify drip trays, relief valves and tags, valves and end caps, gauges and pressures, and travelling valve position. Confirm orientation of non-return and relief valves, instrument manifold setup, and brass elbows for Cryofleet tanks. Check data plates (DNV/EN, ADR/RID/IMO, CSC, ASME, PED), decals, weights, capacity, schematic, and filling ratio. Ensure tie-down stickers, BIC codes, document holder, cabinet, manway, and rubber lining are in place. Capture signatures and rework acknowledgments.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
