This KMT Gemba Rev1 checklist supports lean manufacturing practices on the production floor. It guides supervisors through a structured gemba walk to confirm bottleneck machines are operating, lead boards and production tracking are current, WIP is controlled and available, and all machines are operational. It reinforces 5S+1 organization, TPM sign-offs, WPO compliance, clear aisles, and operator presence. Use it to standardize daily walks, sustain flow, and drive continuous improvement.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
