Skip to content
SafetyCulture
Template

IMM Maintenance Start-of-Shift Audit

by Mike Musclow, from the Community

Downloads: 10+
Get this template

This start-of-shift maintenance audit for Injection Molding Machines (IMM) helps technicians verify equipment readiness in Bay 0. It covers bays 21–24 with checks for oil and lube levels, HYDAC and SVG unit condition, and proper storage of electrical drawings with cabinets secured. It includes material handling mezzanine checks for hopper, hose, air line condition, air leaks, lighting, dryer and blender status, plus vacuum pump condition. A mechanical room checksheet ensures overall room condition is reviewed and documented.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.