This Electrical Work Permit template helps teams plan and authorize electrical tasks safely. Capture permit numbers, work location and validity, and whether it combines with confined space or hot works permits. Verify trained and competent personnel, a current risk assessment, earthing, points of isolation, key retention, caution notices, and safety locks. Record authorization by the responsible contractor and site manager, plus worker sign-on/sign-off. Conclude with permit closure, confirming all equipment is returned and areas are left safe, including any controls left in place.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
