Use this AES solar installation report template to standardize PV installs from arrival to handover. Record installation date, site details, and team members, then complete a pre-install checklist covering risk assessment, scaffolding, equipment on site, panel serials, and agreed equipment locations. Capture in-progress photos of roof hooks, rails, and cable entry points. After installation, document inverter labels and nameplate, DC cable labeling, generation meter details, battery photos, DB board and cable routes, plus full array photos. Enter AC test results (ZE, PFC, ZS, inverter PFC), confirm inverter communications setup, and obtain customer approval and sign-off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
