Skip to content
SafetyCulture
Template

5S Weekly Score Sheet - Timaru Plant

by Enrique Neira-Espitia, from the Community

Downloads: 10+
Get this template

Use this Lean 5S weekly score sheet to conduct structured audits in the Timaru plant. Cover the five pillars: Sort (remove unnecessary items and keep current documentation), Set in Order (organized, labeled storage; tools and cleaning equipment in designated locations; clear walkways and emergency access), Shine (clean floors, walls, ceilings, and equipment; fix leaks and damage), Standardize (post work instructions and 5S controls; complete and sign daily checks), Sustain (weekly audits by trained auditors; close out actions from prior audits). Record observations, capture comments, verify glass and hard plastics integrity, check visual management boards, and calculate a total score out of 16 to determine compliance percentage.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.