Skip to content
SafetyCulture
Template

Winter Shutdown Routine Checklist

by James Cordingley-Wildman, from the Community

0
Get this template

Prepare your manufacturing site for the Christmas break with this winter shutdown routine checklist. Verify mixers, furnaces, compressors and LEVs are powered down, mobile plant is parked, roller doors and lights are off, crane remotes stored and charging, and all gates locked across DC1, DC2 and DC3. Standardize shutdown steps to reduce risk of damage, energy waste, or safety incidents during holidays. Adapt sections to match your site's equipment and procedures.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.