Skip to content
SafetyCulture
Template

Morrisons Cafe Logwood V8 Install Report

by James Hegarty, from the Community

Downloads: 30+
Get this template

This guided installation report is designed for deploying the Logwood system in Morrisons Cafe locations. It walks engineers through arrival checks and RAMS review, captures time on site, and requires photos of the distribution board and cabinet before and after works. Technicians document switch ports, verify IP addresses for chef, servery, and third screens, and record serial numbers for monitors, Pik Boxes, and bump bars. The form covers power and data checks, labelled outlets, cabling lengths, patch panels, brackets, and stainless drops. It also includes Elecktrak plug usage, third screen installation, testing confirmation with mission control, site clean-up, and customer and engineer sign off.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

Morrisons Cafe Logwood Install Report Form | Free Template