Skip to content
SafetyCulture
Template

Cables T and I Handover after WTG Installation

by Martin Warming, from the Community

Downloads: 0
Get this template

This internal handover survey standardizes testing and inspection of cables and access systems after wind turbine installation. It covers boat landing, ladders and fall arrest, external platforms, davit crane, turbine entrance and stairs, internal bolting platforms, junction boxes and aluminum bag checks, cable trays, earthing, coatings, cleanliness, and seafastening. Capture photos, note defects, verify safety equipment, and record corrective actions for a clean signoff.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.