Skip to content
SafetyCulture
Template

Standby Generator Monthly Run Test 10 Minute

by Carrie Sear, from the Community

Downloads: 0
Get this template

Perform a consistent 10 minute monthly run of your standby generator and document results with this checklist. Record site, date, and start and finish times, then complete a visual inspection covering fuel, oil and coolant levels, leaks, battery condition and voltage, cleanliness inside and out, rubber hoses and belts, engine heater operation and air filter status. Remove water or debris as needed and capture comments for follow up. PPE required includes ear defenders, eye protection and gloves.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.