Use this comprehensive solar PV installation inspection checklist to verify quality, safety, and compliance across every stage of a grid-tied PV project. Capture equipment details, module layouts, earthing and bonding, MC4 connections, cable tray routing, labeling, and adherence to final design. Review PV Sub DB, Main DB, inverter breakers, and protection settings, confirm SLD alignment, torque checks, and serial numbers. Validate commissioning steps, CoC testing, SPDs, OOB relays, and generator integration. Assess communications, dataloggers, SCADA, RS485/Modbus wiring, CT placement, and network setup. Include photos, evidence, and notes to produce reliable as-builts and handover.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.