Skip to content
SafetyCulture
Template

Red Energy Grid-Tie Site Survey Checklist

by Jakes Joubert, from the Community

Downloads: 0

Conduct comprehensive site surveys for Red Energy grid-tie solar installations with optional battery backup. Record property and roof details, orientation and pitch, shading, structural spacing, cabling distances, inverter location, and AC connection specs including phase and amperage. Capture photos of the roof, DB board, and meter, confirm meter reversibility, and assess dedicated circuit moves and appliance loads. Document battery backup requirements, sizes from 1 kWp to 20 kW 3-phase, and collect customer and surveyor signatures.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.