Wastewater Quotation and Site Survey Template
by Becca Dillon, from the Community
This comprehensive template streamlines quotations and site surveys for wastewater system installation and upgrades. Capture customer and site details, proposed works, inlet and outlet drainage measurements, inspection chambers, point of discharge, and percolation test results. Document power supply and RCD availability, septic tank status, emptying volumes, tanker access, spoil removal, reinstatement needs, and materials such as gravel and cable. Assess access constraints, vehicle size, ground protection, traffic, ground conditions, and requirements for shoring, fencing, signage, and storage. Record regulatory items including Building Notice, Environment Agency permits, planning, mains sewer connections, directional drilling, Section 50, EMS file needs, and routine maintenance. Include equipment, excavation depths and lengths, and annotated site photos to support accurate pricing.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
