This wastewater installation survey template helps contractors and estimators scope drainage and sewage treatment works accurately. Capture customer and site details, proposed system, percolation test results, drainage field meterage, inlet and outlet drainage for soft and hard dig, and required inspection and outlet chambers. Record power supply location, RCD availability, and cable needs. Assess access, vehicle size, ground conditions, and whether shoring, a breaker, or a hydrainer is needed. Specify fencing, signage, welfare, ground protection, storage areas, and site traffic. Document overhead or underground services, permits such as Building Notice, Environment Agency permit, and Section 50, plus mains sewer connections and maintenance. List machinery, materials like gravel, any prerequisite works such as CCTV, and add photos.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
