Pre-Heat Installation Projects Audit Checklist
by Amy Ensor, from the Community
Use this audit checklist to verify new pre-heat system installations against G17 and SCO requirements for gas networks. Capture project identifiers (G17, NRO), installation company and personnel, and audit type. Confirm presence of the full G17 project file and Parts A–F, approved NRP, and a Competent Person in control. Check end-to-end test sheets, EL/6 electrical isolations, and that works follow the approved G17 design. Record results of electrical and hazardous area inspections, competency of installers, and completion of commissioning. Validate availability and submission of As Built drawings to Statutory Records, ensure marked-up drawings are left on site, and that E&I asset data is collected via the ADC template. Note site condition, sign-offs (G17 Parts D and E, NRP sections), and any additional comments.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
