Skip to content
SafetyCulture
Template

MGN Maintenance Audit - Mains or Service Stoppage

by Karen Kennan, from the Community

Downloads: 0
Get this template

This gas maintenance audit guides crews through safe work before, during, and after mains or service stoppages. It covers permits, JSEA and SWMS checks, DBYD and asset locating, excavation support, PPE, confined space and respiratory protection, environmental controls, electrical testing at meters, asbestos and coating removal, meter isolation and disconnection, venturi water removal, regulator checks, leak tests, purging, and relight. Includes sign off for auditor and crew leader.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.