This post-work audit checklist for MGN gas distribution helps supervisors and auditors review reinstatement quality, adherence to MG standards and AS 5601, and overall site housekeeping after works. Items include temporary and permanent reinstatement, waste removal, red card and consumer clean up notices, refix or relight, meter location and protection, fitting line and regulator vent installation, slab and enclosure, tracer wire, manifold support, marker posts and covers, line valves, abandoned up stand removal, leakage location, and daily location sheet accuracy. It also checks compound security, fire protection equipment, signage, and PPE notices to ensure safe, compliant handover.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
