Use this audit protocol to assess cathodic protection potential surveys and data logging activities. Verify equipment calibration for multimeters, reference cells, and data loggers; locate and prepare test points; place reference electrodes; measure and record structure and earth stake potentials; configure and connect data loggers; record serial numbers and installation times; retrieve and download charts; validate data and investigate anomalies; repeat recordings if required; and save charts for assessment. Includes comments and sign-off for auditor and crew leader.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
