This inverter checklist supports solar PV installation and commissioning. Inspect site and inverter number, ducting and terminations, labeling and mounting, string cable dressing and permanent labels, LV cable length, lugs, heatshrink, and phasing. Verify torque settings (M12 25-30 Nm, M10 15 Nm), external earth bonding, welds and crimps, and enclosure sealing. Check PV table labels, edge protection, and cable ties. Confirm spoil backfilling and that no overspill, soft spots, or standing water remain. Use this guide to standardize safety, quality, and compliance prior to handover.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
