This Equans ST Inverter Checklist supports safe, compliant solar PV and electrical installation work. It covers site and approval sign-offs, inverter numbering, ducting installation and sealing, removal of sharp edges, correct inverter location, labeling, and secure mounting. It includes checks for termination boxes, string cable labeling and dressing, LV cable length and labeling, correct phasing, heatshrink, and torque requirements (e.g., M12 lugs 25–30 Nm, M10 15 Nm). It also verifies spoil backfilling quality, absence of soft spots or standing water, and external earth bonding quality. PV table labeling, trimmed ties, and edge protection are included.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
