Use this checklist to verify correct installation of solar PV upper structures for PF Zevent systems. Inspect frame condition, fastener torque using a calibrated wrench, and confirm structure is built to design. Check distances and alignment tolerances between frames, verify duo pitch tables have minimal height difference with at least 30 mm separation, and confirm inclination is set to 10 degrees plus minus 1 using a calibrated inclinometer. Ensure piles and beams align without stressing joints, treat any drilled areas appropriately, and confirm the framework is free from corrosion. Record site, location, date, and preparer, and mark items compliant, non compliant, or not applicable.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
