This EV charging handover checklist helps capture all critical information needed to commission and operate a charging site. Record tenant and technical contacts, Prologis contacts, installation address, hardware details (AC/DC types and counts), grid capacity and load balancing, portal access, charge card and tariff settings, reimbursement details, and financial terms. Define SLA uptime targets, warranty and O&M duration, and log commissioning data and required documents to ensure a smooth transition to operations.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
