Enclosure Arc Flash and Protection Assessment
by Shaun Young, from the Community
Use this structured checklist to assess electrical distribution board enclosures for arc flash and protection requirements. Record main and secondary incomers, generator details, breaker models and In ratings, trip and earth leakage settings, and detailed incoming and outgoing feeder information. Document cable types, installation routes, shared runs, and lengths, and attach photos with escutcheon open and closed to verify labels and settings. The form helps standardize data capture for arc flash risk reviews and supports compliance across high‑risk electrical environments.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
