Skip to content
SafetyCulture
Template

DN-07c Test and Purge MP Service (<= 2 in / 63 mm)

by Alan Milford, from the Community

Downloads: 0
Get this template

Use this DN-07c checklist to test and purge medium pressure gas services up to 2 inches or 63 mm in line with SGN procedures. Steps include fitting test equipment, introducing air, pressure testing at 3 bar with no allowable loss, and checking joints with approved leak detection fluid. Guidance covers safe purging to atmosphere, communication between operatives, and commissioning for PE and metallic connections. The checklist also includes criteria to stop purging, verifying the service excess flow valve operation, depressurizing safely, and recording results. Finish by capping the ECV or inlet valve, labeling as required, and signing off.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

DN-07c Test and Purge MP Service Checklist (<=63mm) | Free Template