Skip to content
SafetyCulture
Template

DN-07 Service Laying Electrofusion Checklist

by Alan Milford, from the Community

Downloads: 0
Get this template

This DN-07 service laying checklist guides operatives through safe electrofusion of gas service pipes. It covers verifying pipe and fitting size and SDR, heating and cooling times, choosing a flat dry work area, using shelter for wind chill, keeping fittings clean in protective bags, scraping and cleaning joint areas, voltage and generator checks, use of restraining and re rounding clamps, penetration depth marking and alignment, fusion setup and timing, standing clear during fusion, controlled cooling, visual indicator checks, and optional data capture of results. The checklist references the lower explosive limit threshold at twenty percent LEL for equipment placement.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.