This Service Laying quality audit checklist supports field teams installing gas services. It covers general requirements (procedures, permits, SSRA), service laying standards (marker tape, valves, sleeves, bonding, ECV, meter boxes), excavation and open cut controls, live/dead insertion and Serviflex methods, soil displacement moling, meter disconnection, pressure testing, and purging/commissioning. It also details PE pipe handling, electrofusion and butt fusion jointing practices, under pressure working/flowstopping, safe person and BA requirements, plant location and CDM documentation, and environmental controls including spill management and waste. Use it to verify compliance, record results, and improve installation quality and safety.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
