CTMeterV2 Deployment Form 1.0 Tanga Project
by Doguscan Tumkaya, from the Community
A guided deployment checklist for CTMeterV2 water meters used in the Tanga project. Includes pre install checks, instructions to avoid water flow until requested, and fields for operator name, site location, meter serial number, and mechanical register photo with last six digits. Provides a step by step startup test to run 10 liters through the meter and verify the buzzer signal, with prompts to repeat if needed. Designed for field teams commissioning water meters safely and consistently.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
