Commissioning Report JSG V1 SunGiga Battery System
by Sergio Molla, from the Community
This commissioning report template is designed for SunGiga battery energy storage systems. It guides teams through cold and hot commissioning, including enclosure and connection checks, clearances, connector integrity, cooling system inspection, torque verification, fuse and SPD status, thermostat and fan checks, and grounding continuity. It covers energisation steps, internal and client networking, IP setup for SCU, PCS, and BMU, software upgrades, chiller settings, protection tests for smoke and heat sensors, EMS visibility and control, functional testing, emergency stop, and final confirmation with signatures.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
