Use this comprehensive Asset Handover Walkdown Checklist to confirm operational readiness and safety before transferring assets at commissioning. The template guides you through access and fencing, signage, lighting, roadways, drainage and housekeeping, plus environmental controls such as spill kits, waste management and bund integrity. It covers external structures, foundations and civils, inverters and earthing, HV rooms and switchgear, control rooms and SCADA, transformers and metering, and rooftop or ground mount solar specifics. Capture issues, record compliance, and standardize handover documentation.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
