Skip to content
SafetyCulture
Template

Warden Call, Door Entry and Electrical Installations

by Daljit Gill, from the Community

Downloads: 10+

This post-installation checklist covers warden call, door entry and fire alarm systems per BS5839 standards. It includes evidence and documentation requirements such as commissioning and electrical installation certifications (NICEIC, BAFE SP203), O&M manuals, fitted drawings, panel setup and downloads, cause-and-effect, zone charts, device labeling, and data sheets. The checklist guides installation inspections (containment, cable routing, fire stopping, labeling, cabinet wiring, surge protection, UPS switchover) and functional tests across alarms, panels, access control, and automated doors. It also verifies ARC signaling, battery backup, mains isolation, lift grounding, shutdowns, and fault simulations, with sections for photos, flat testing, and comments.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.