Skip to content
SafetyCulture
Template

Drywall Inspection - Wates Hoxton

by Simon Thayer, from the Community

Downloads: 10+
Get this template

This drywall inspection template is designed for Wates Hoxton projects to help site teams systematically check first and second fix activities and finishes. Sections cover frame and board, fire tape, electrical back boxes and straps, noggings, insulation, head tracks and fire seals, fire batts for voids and penetrations, second fix boarding, pod head infills, window jambs and cills, first tape and joint, vapour barriers, ME cupboard wings and noggings, remaining apartment walls, and pocket door insets. The checklist supports photo capture, issue documentation, and completion sign off by the subcontracting manager with confirmation by a Wates manager. Locations can be recorded by tower and level for clear traceability.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .