Skip to content
SafetyCulture
Template

Wall Tie Installation Report

by Mark Griffiths, from the Community

Downloads: 0

Use this Wall Tie Installation Report template to document masonry tie works and verify quality on site. Capture property details, tenure, and client, then complete an external inspection with photos of all elevations. Record the external finish, note any obstructions or access issues, and confirm asbestos checks. During installation, verify cavity wall insulation status and any previous extraction, confirm elevations are clear, and check that new wall ties are installed as recommended and corroded ties are isolated. Log making good, pull test results, and upload photos of finishes and ties. Add a concise surveyor’s statement with date and name. A dynamic risk assessment section covers common site hazards including ladders, towers, manual handling, roof work, electricity, vibration, noise, compressed air, cement and mortar, MEWP use, housekeeping, reversing vehicles, and lone working, followed by client declaration and signatures.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.