Use this OSHA-focused inspection checklist to certify chain, wire rope, synthetic web, and fiber rope slings at least once every 12 months. Record sling IDs, ratings, sizes, and original length; assess link wear, deformation, corrosion, cuts, heat damage, stitches, and knots. Confirm tag legibility and configurations, check end fittings for wear and throat opening, and verify overall length within 5 percent stretch. Capture inspector name and signature for documentation.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
