This tracker installation works checklist supports quality and safety control for utility-scale solar PV projects. It covers delivery verification, bearing plumbness and height checks, required torque specifications for bearings and gear drives, and rotating capacity against design tilt. It guides motor foundation placement, gear drive and motor lubrication and fastening, torque tube installation with N/S inclination and local deflection limits, and correct purlin positioning, parallelism, and perpendicularity. Includes recording of actual values and a contractor and PMC sign-off for accountability.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
