Skip to content
SafetyCulture
Template

Taggas Installers Pre Walk Around

by Tim Devlin, from the Community

0
Get this template

This template guides installers through a pre installation walk around for residential heat pump work. It covers engineer checks including PPE readiness, safe ladders and working at height equipment, and confirmation that tools are tested and in good condition. It prompts site protection such as dust sheets and clear walkways, and records a customer walkthrough covering equipment locations, pipe routes, radiator changes, and housekeeping. It sets expectations about possible floor disturbance, furniture movement responsibility, safety around pets and children, time frames without heating and hot water, and alternative heat sources. Customer and engineer signatures, names, and dates are captured.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.