This stage-by-stage installation checklist helps installers and site managers verify quality and compliance from start to finish. Stage 1 covers base profiles, patresses for external fittings, insulation placement, adhesive mortar application, board bonding and interlocking at corners, correct fixings and embedment, and angle beads set to line and level. Stage 2 checks mesh coat application including stress patches, minimum overlaps, full encapsulation, flat finish, clean reveals, and masonry sealer coverage with pre–top coat checks. Stage 3 verifies top coat application, clean frames and soffits, removal of rough edges, sealant at at-risk terminations, and neatness. Includes weather, temperature, time logs, comments, and client sign-off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
