Use this SMS 203 Safe Start Briefing to prepare construction teams at White City for daily works. The checklist covers supervisor to operative ratios, RAMS references, plant inspections, access and egress, barriers and signage, task lighting, and permits such as hot works, step ladders, hop ups, and limitations of access. It includes guidance on power tool HAV, noise and dust controls, MEWPs, podiums, towers, manual handling, Genie lifts, drilling and cutting, sharp objects, COSHH, live systems, abrasive wheels, welding, soldering, electrical testing, and pressure testing. Capture signatures from supervisors and operatives and confirm the briefing.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
