Skip to content
SafetyCulture
Template

RWF Plot 20 Apartment Pre-Start Report

by Wayne Budge, from the Community

Downloads: 10+
Get this template

This apartment pre-start report template is designed for residential construction at Royal Wharf Plot 20. It helps contractors and subcontractors, including GMEP, verify that apartments are ready for the next sequence of electrical and mechanical works. Capture apartment details, contractor, block and level, then assess readines across rooms such as hall, lounge, kitchen, bathrooms, and bedrooms. Log common issues like missing fittings, incorrect back box cutouts, smoke and heat detector gaps, and tile or lighting cutout defects. Attach photos of snags, add notes and additional comments, and record signatures to issue the report. Use this checklist to streamline snagging, coordinate trades, and confirm pre-start readiness before progressing to the next stage.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

Apartment Pre-Start Report Checklist | RWF Plot 20 | Free Template