This BEMCO 2nd Fix checklist helps electrical teams complete quality assurance during building fit-out. Verify trunking and end caps, isolator and fuse ratings, cable type and size, correct bending radius, and CPC continuity in line with the 18th Edition. Confirm labeling on SWA and 6491B, install DB charts, and ensure plastic separation between live, neutral, and earth bars. Remove swarf, blank holes, replace missing panel screws, and torque vertical busbars to spec. Check manufacturer-compliant tap-offs with correctly glanded metal kopex and satisfactory earthing. Capture photo evidence, log clashes and issues, and collect installer, supervisor, and manager signatures.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
