Use this RNM DOC 003 second fix QA checklist to complete and verify apartment fit-out works. Confirm all circuits are second-fixed to drawings, appliances connected, fire and acoustic inserts installed, smoke and heat alarms interconnected and tested, lights and switching configured correctly, fans boosting, lamps flush, blanks fitted and labeled, accessories level, heaters and towel radiators secure, consumer unit labeled, and installer test sheets completed. Capture drawings and photo evidence, record clashes and issues, run function tests for lighting, sockets, MVHR boost, white goods, and heating, and obtain installer and supervisor sign-off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
