This RMS R11 open drains surveillance checklist supports civil works teams inspecting stormwater drainage and culverts. It covers set-out verification, excavation and embankment requirements, minimum dimensions and grades, compaction criteria, acceptable lining types (organic fibre mat/vegetation or concrete), movement and expansion joints, and construction tolerances. It also includes G22 safety items such as SWMS, PPE, plant suitability, lifting gear, excavation access and benching, and G36 environmental controls for erosion and sediment management, housekeeping, and incident prevention. Compliance, NCR/CAR tracking, and follow-up actions are included.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
