Skip to content
SafetyCulture
Template

Firestopping Installation Checklist - FIREPRO HS

by Alex Dobra, from the Community

Downloads: 0

This QMS checklist supports safe, compliant installation of FIREPRO HS Firestop Compound. It guides teams through key steps: confirm project and area details, verify fire rating, clean the aperture and edges, apply acoustic intumescent sealant to batt edges with even coverage, fully fill gaps between batt and substrate, and protect plastic pipework using approved collars or intumescent wraps. Mix the HS Firestop Compound to a smooth, even consistency and install within suitable temperatures (5 to 35 C). For loadbearing requirements, pour a minimum 100 mm depth in a single pour, then smooth the surface for a professional finish. Use this checklist to strengthen quality control, consistency, and fire-stopping compliance across service penetrations.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

Firestopping Installation Checklist | FIREPRO HS Compound | Free Template