Skip to content
SafetyCulture
Template

Firestopping Installation Checklist: Ablative Coated Batt

by Alex Dobra, from the Community

Downloads: 0

This checklist guides installers and quality teams through ablative coated batt firestopping, covering site preparation, accurate cutting and fitting, application of acoustic intumescent sealant on all edges and around services, gap filling, and verification on both sides of the batt. Use it to document project details, fire ratings, areas inspected, and conformity with best-practice steps for cable trays and penetrations. Intended as a general guide; verify requirements for your project and jurisdiction.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

Firestopping Checklist: Ablative Coated Batt Installation | Free Template