Skip to content
SafetyCulture
Template

QC Inspection #5 Post-Delivery Checklist

by Kevin Bush, from the Community

0
Get this template

Conduct a comprehensive post delivery inspection for manufactured homes within 48 hours of blocking, leveling, and anchoring. This checklist verifies placement against the site plan and required setbacks, documents any delivery damage, and requires timestamped photos. Confirm locks and security, bonding wire and water crossovers, removal of tires, axles, and hitch, pad slope and access. Review blocking, shims, piers and anchoring for code compliance. Record corrective actions, add notes, and capture signatures.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCultureโ€™s Terms and Conditions.

QC Inspection #5: Post-Delivery Manufactured Home Checklist | Free Template