Conduct a comprehensive post delivery inspection for manufactured homes within 48 hours of blocking, leveling, and anchoring. This checklist verifies placement against the site plan and required setbacks, documents any delivery damage, and requires timestamped photos. Confirm locks and security, bonding wire and water crossovers, removal of tires, axles, and hitch, pad slope and access. Review blocking, shims, piers and anchoring for code compliance. Record corrective actions, add notes, and capture signatures.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCultureโs Terms and Conditions.