Use this QA QC checklist to verify cavity barrier installation across floors and elevations. Confirm the correct barrier type per fire strategy drawings, proper fixings, tight abutment to manufacturer guidelines, and sealed cuts and joints with foil tape. Check vertical barriers are under compression and horizontal breaks allow the specified airflow, typically 50 mm unless otherwise designed. Ensure SFS wall barriers are fixed into studs. Record location details, levels from GF to roof, and sign off to document compliance.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
