Skip to content
SafetyCulture
Template

Horizontal Tenmat Fire Barrier QA Checklist

by Roman Fedenko, from the Community

Downloads: 0

This A2O quality assurance checklist guides the inspection and installation of horizontal Tenmat fire barriers within cladding cavities. It covers pre-installation requirements such as supplier coordination and training, availability of fire barrier schedules and drawings, and operative briefings. On-site checks include sequence after vertical barriers, locations per drawings, thickness vs cavity void, maintaining a 25 mm airflow gap, correct folding and spacing of VFB brackets, non-combustible fixings at max 500 mm centres, tight abutment and sealing with intumescent sealant, and arranging Tenmat inspection prior to cladding finishes. Includes digital sign-offs and photo evidence.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.