A2O Tenmat Fire Barrier Behind Sheathing Board QA
by William Carter, from the Community
This template supports quality assurance for installing Tenmat fire barriers behind sheathing boards on construction projects. It guides teams through pre-installation checks, materials verification, storage and handling, and coordination with suppliers. Installation steps cover location and thickness checks against A2O drawings and manufacturer specifications, fixings at 500 mm centres with non-combustible hardware, proper compression and abutment, and sealing voids with approved fire mastic. The checklist enables adding photos, notes, and corrective actions, and concludes with digital signatures from installer, A2O, and client. Use it to standardize training, document compliance, and ensure a compliant building envelope.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
